Exciting News and Visible Progress

 In Athletics, News

At the start of school, we proudly shared our excitement over the newly adopted Long Range Plan.  One important aspect of that plan, and the last item remaining from the previous plan, is the repair of our track.

We are thrilled to share that we are well on our way to making that dream a reality.  The wheels have already been set in motion for that much-needed facilities improvement, and preparations have begun for the resurfacing of the gravel areas leading up to Panther Stadium and the track.  This step is crucial in maximizing the lifespan of a new track by removing nearby materials that can damage it.

From Friday, December 22, 2017 – Wednesday, January 3, 2018, the Bank Street entrance of the school from the administration building all the way to the concessions area, including the bus loop, will be closed for resurfacing.  NO vehicle traffic will be allowed in that area.  Coaches of individual sports will provide directions to their athletes regarding parking access for practices and games during this window.

We appreciate your patience with this minor inconvenience as we know the great benefits it will bring to our campus and students.

Recent Posts
Contact Us

Not readable? Change text. captcha txt